Newly built extension to our stainless steel fabrication shop

Newly built extension to our stainless steel fabrication shop

In 2013, the “NIRO-PUR” stainless steel production and assembly building was extended with particular emphasis on:

  • Economical stainless steel container manufacturing
  • New construction of high-spec lounges for our staff
  • Central goods receipt and dispatch area with a truck loading station
  • Automatic AKL storage system for small parts for the efficient commissioning and storage of individual parts and small parts (1,600 bays at 250 kg each)
  • Extension of the mechanical manufacturing area with a CNC turning and processing center
  • Storage buildings for big parts and pallet storage areas with a floor space of approx. 2,500 m2